Originally Posted by
RamIt
So I live chatted Ram Care today to get an update on my case. The result - "Your truck is in D status awaiting parts. Typical build time is 8-12 weeks." :|
So I called FCA directly, cause I'm growing tired of the misinformation; I'll make a long story short:
-Truck is in D1, has been since 6/1
-Ramp date of 6/22 was not retracted, FCA says the truck is supposed to be on a train already, but no information exists.
-The VIN still pulls as a 2017 Charger, but is confirmed "on another screen" as being the right VIN for the truck.
-Literally nobody has any idea if the order is actually going to be built, has already been built, is on a train somewhere, or if none of the above has occurred.
I'm to call back on July 8th for an update. Which the rep I spoke with said she didn't know what happens at that point because she's never seen this before.
Aren't I lucky....
Bookmarks