Well I don't have my truck yet but I figured that since this is the first time I've ever ordered a vehicle from the factory, and I'm pretty excited about it, I would start a thread to catalog the whole process. Not much to talk about now, but the configuration is below. Here's to hoping it's done sooner than later!
THE BUILD:
2019 2500 Laramie Crew 4x4 6'4"
Cummins
Anti-spin axle
3.73
Black Appearance Package
UConnect 12"
Laramie Level 2
Tow Tech
Safety Group
RamBox
Clearance Lamps
Instrument Panel Aux Switches
Dual alternators @ 440A
Leather 5-person seating
5/24/19 - Order placed with dealer
5/28/19 - Order accepted by Ram
5/30/19 - D Status & VIN
6/1/19 - D1 Status (Gateline scheduled)
6/17/19 - Ramp ETA given
6/21/19 - Ramp ETA retracted & case opened
7/6/19 - E Status (Frame)
7/7/19 - F Status (Paint)
7/9/19 - Build Sheet & Window Sticker available
7/15/19 - KZ Status
7/17/19 - KZM Status
7/22/19 - KZN/KZU Status - Awaiting unloading from rail & delivery to dealer
Current dealer arrival estimate: 7/27/19
Current take-home delivery estimate: 7/29/19
Bookmarks